Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Depending on whether the order type is Service Workshop (2000) or Internal Service Workshop (4000) with or without internal billing and depending on the event (Save or Bill), the system compares the price limit of the job with different prices/costs when it performs the check. The following table illustrates these differences:

Order Type / Event

Save Order

Bill Order

Service Workshop (2000) with external billing document

Gross or net price

Gross or net price

Internal Service Workshop (4000) with internal billing (IS-A-VSS)

Gross or net price

Gross or net price

Internal Service Workshop (4000) without internal billing

Planned costs that equal the pricing condition VSS Min. Margin Costs (QMMC)

Actual costs that equal the costs of the Controlling document

...