Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info

To get an overview of all configuration steps necessary for the selected reserved material scenario, navigate to Reservation on technician storage location, SD Reserved material, DC reserved material or MM reserved material

...

Material reservation is created when a component is entered into a service order and sent to the cloud. This transaction is used to define what type of action should be done on a reserved material depending on the reserved material scenario. With the goods movement the original entry is reduced, and a new entry created.

...

MvT

...

increase/decrease quantities of reserved materials (table /PACG/ECM_ARMAT), based on goods movements in SAP ECC/S4. It’s not considered for material documents created based on consumption/transfer in FSM.

...

MvT

Movement type used in reserved material process should be configure new entry in this tablethat should trigger reserved material quantity update

D/C

Debit/Credit - from the position of the goods movementindicator retrieved from material documents (S = debit, H = credit). E.g. posting delivery for consignment fill-up (SD Reserved material) results in the following material document positions, with the following D/C indicator:

Image Added

In that case, FSM Cloud Connector will first clear the reserved material entry for plant reservation:

Image AddedImage Added

and then increase the shipped quantity in the entry for special stock.

Image AddedImage Added

The material will be sent to FSM as shipped and visible on the special stock.

Special Stock

It is possible to choose if the configuration will be created used for normal stock or one of special stock. Make sure that special stocks are set for the correct entries when using SD Reserved material scenario.

Image Added

Action on component

Decision what chosen movement type will do with material stock in the original entry on the material reservation

  • Subtract

  • Add

  • No action

Action on shipped

Decision what chosen movement type will do with the material stock in the new entry on the material reservation

  • Subtract

  • Add

  • No action

Shipment type