Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

On the left side of the application user can find the list of all demands.Workshop planner – Time clocking interval (4)

On the right side of the screen a table view with demands allocations is showed.

Workshop planner – Time clocking interval (1)Image ModifiedWorkshop Planner - overview screen


The planning of the SRS-Order can be done automatically via the OAS Application or via the Report /DBME/WMA_WP_BC. The system is doing the planning in assigning the demand type of the SRS-Order Items to the relevant Resources with the resource role. This assignment is found in the planning scenario. The scenario can be found by several parameters from the SRS-Order:

  • Company Code
  • Sales Organization of the relevant Hierarchy ID
  • Plant
  • Distribution Channel
  • Division
  • Order Type of the SRS Order
  • Hierarchy ID of the SRS Order
  • SAP Username

...

Workshop planner- Assignment with rescheduling option

Demands and Time-Clocking Integration 


Whenever a technician starts booking time against a VSS order for an SRS demand, a new time interval appears under the SRS order allocation, showing the technician status and the work-in-progress(WIP) %.


The time interval colors are changed based on the time clocking events and WIP %.

Image AddedWorkshop planner – Time clocking interval (1)


Image AddedWorkshop planner – Time clocking interval (2)



Image Added

Workshop planner – Time clocking interval (3)


Image Added

Workshop planner – Time clocking interval (4)







In the SRS configuration, maintain the colors against the time-clocking events and WIP %.

The colors can be maintained based on the personnel status, event mark, event type, or their combination (e.g., event type and event mark).

Image Added

WPL-TC integration event color (1)


Image Added

WPL-TC integration event color (2)


To exclude certain demand types and resource roles from displaying the time clocking interval, it should be added to the SRS configuration below.


Image Added

Exclude Resource Role and Demand Type from TC integration (1)


Image Added

Exclude Resource Role and Demand Type from TC integration (2)


If the HR personnel number and SRS resource ID don't match, the customer can utilize BADI /DBME/WMA_RESOURCE for mapping. This will enable the integration of the Time Clocking and Workshop Planner applications.

Jump to another apps

Workshop planner - jump to another apps

...