Configuration of proaxia Field Service Meter-2-Cash

For detailed configuration instructions and checklist templates, refer to the corresponding sections provided separately.

Prerequisites: Ensure that an operational SAP IS-U (Utilities) / SAP S/4HANA Utilities system is in place before the FSM Connector Utilities M2C add-on is configured and used.