Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

(S4)PACG 200 SP05

This transaction allows user to fill the field Service Product when service order is create from FSM side. There are some parameters which can help identify what kind of service product. In the last column, the desired service product name is entered under specified assumptions.

Service material determination dependent on few factories:

Company

In every setting company must be entered. This field is obligatory to create determination.

Type

Order Type can be entered alone (except company) or with the others factories.

MAT

Main Activity Type has similar property as Order Type.

PG

Planner Group must be entered with Planning Plant. If PL. Equip./FL flag in Service call general settings is not checked then data is collected from table t024i.

PlPl

Planning Plant is inseparable with Planner Group. Due to the luck of such field during create servie call in the FSM there is determination to equipment which belongs to particular Planning Plant. Additionally PL. Equip./FL flag in Service call general settings must be checked. Otherwise Planning plant is taken from /PACG/ECM_PLAS.

After successfully created service order in FSM, our Service product should display in back-end system.

  • No labels