Info |
---|
FSM Cloud Connector release PACG 200/S4PACG 200 SP2 aligns with SAP FSM release 2108 |
Post-installation steps
Run /PACG/ECM_SETUP
In transaction /PACG/ECM_CLSASSIG - E4C Outgoing Messages Configuration change setting for message /PACG/ECM_EQUI and set IDOC creation class to /PACG/ECM_CL_S_IDOC_O_EQUI2
In transaction /PACG/ECM_ACTIVE check if all the settings related to setting up the references between activities' attachments meet your requirements
New features
Category | Feature description | ||||||
---|---|---|---|---|---|---|---|
Service order/Activities |
| ||||||
Reserved materials | ‘Book component’ option in service order settings of FSM Cloud Connector , if set, causes addition of new reservation for material in case of so-called ‘unplanned consumption’. The The new reservation was also created if there was already one for a given material. Due to customers’ request, this has changed. Now, in case of unplanned consumption, FSM Connector first checks if there is already a reservation for a material and creates it there is none.
| ||||||
Materials | Additional way of determining if a material is batch-managed - this new feature has a significant impact on the determination of batchable/non-batchable materials but specially the second oneslatter. Default determination was the following: check general material data, check plant material data, and check valuation of material. So even Even if material was set as non-batchable but valuation was found, it was sent send as batchable. Now A new configuration option was introduced. If it is enabled, then the valuation is not checked and only material’s settings are considered.
| ||||||
Expenses | Until now, when posting expenses using cost centre the latter one center, the cost center was determined based on either work centre or center of the person (technician) or simply the fixed value stored in the customizing was used. With A new release a new option was introduced - it will also be also possible to use cost centre center determined based on the activity type.
| ||||||