[OBSOLETE] /PACG/ECM_SCTD – Service Call types definition: Overview and Detail

As of (S4)PACG 200 SP12 the transaction /PACG/ECM_SCTD – Service Call types definition: Overview and Detail is considered obsolete, hidden from the FSM Cloud Connector menu and shouldn’t be used to maintain order type-specific customizing. One of the following alternatives must be used instead:

General purpose

Enter order types relevant for FSM (replicated to FSM as service call types) and maintain order type-dependent settings.

Sending transaction (?)

https://proaxia-prod-doc.atlassian.net/wiki/spaces/PFCC/pages/38175368

(S4)PACG 200 SP09 You can navigate to the sending transaction using the button Send to FSM, placed on the toolbar.

Object assignment (?)

Object SERVICECALLTYPE must be added to for a given company

Overview

 

 

Deleting entries here will also delete the entries in .

Errors related to this setting:

/PACG/ECM_MAIN378 Creation of service order for comp 0001: No default type could be found.
Check if there are more than one active flag checked for the same company id.

/PACG/ECM_MAIN654 Cannot determine workcentr for equipment and order New.
/PACG/ECM_MAIN653 Cannot determine workcentr for order New.
For the above two errors, check work center source settings

Customizing options

 

LONG LABEL Long labels are used in view cluster transactions (e.g. ).

Active

Switch to activate/deactivate order type.

Creation Allowed

LONG LABEL Create orders for serv.calls from FSM

Specify whether the service order creation from cloud is allowed.

Create Default

LONG LABEL Default type for order creation  

Specify whether order type is a default order type for order creation from cloud.

Scheduling Type

Specify scheduling type for order creation from cloud. Available options include:

  • forwards

  • backwards

  • only capacity requirements

  • current date

  • forwards in time

  • backwards in time

Dates Sched Rule

Define dates scheduling rule. Note that this is only applicable for FSM inbound into SAP)

  • Blank - No action.

  • S: Set Restrictions for Scheduling Start/End dates. Start & end date from service call header is taken as the default for the activities.
    Learn more:

  • R: Re-calculate start & end from duration
    Taking into account work center's available capacity – in this case, it will provide only work duration to the service order's operation, then Scheduled Start/End dates will be automatically adjusted.
    Learn more:

Automatic billing

LONG LABEL Create a debit memo req. after checkout 

Specify if Automatic billing should be performed after checkout.

 

Note: in order for automatic billing to be performed this settings need to be set, as well as IDocs needs to be processed correctly.

Use ReqAssig

LONG LABEL Use req. assign. instead of oper. pernr 

If an activity is assigned to a technician in FSM, the personnel number will be stored in a service order requirements assignment. Requirement assignments created in SAP ECC/S4 can result in activities assigned to the requirements' technicians (one split = one activity). Using requirement assignments allows existence of multiple activities for one operation.

(S4)PACG 200 SP05 Only if rel. op.

LONG LABEL S.calls not sent if no FSM-rel. oper. 

When enabled, it’ll prevent transfer of a service call to SAP FSM, if none of the related service order’s [network’s/notification’s/WBS’s] operations [activities/tasks/sub-WBSs] is FSM-relevant. For service orders operations both control key and work center are checked (see transaction ).

If there’s no relevant operation [task, activity, wbs element], an information is added to the log file:

 

If a service call used to be relevant but no longer is, it is sent to FSM with deletion flag and activities are closed.

ContactNotif

Determine contact person from service notification. If the flag is checked, then contact person from notification is being sent. If the flag is not checked, then contact person from service order is being sent.

If the flag is checked, then contact person from notification is sent:

If the flag is not checked then contact person from service order are being sent:

MRS active

LONG LABEL 1st pernr from req. ass. as technician

If enabled, then the first person from resource assignments (table KBED) will be used as operation’s technician.

Customer source

 

The field Customer source serves as an alternative way of customer determination (if determination based on customizing options Sold-to/Ship-to failed) for notification/WBS/network order-based activities and notification/network order-based service calls:

·       During outbound processing of notification-based service calls | Business partner determination for notification-based service calls

·       During inbound processing of time efforts for WBS-based activities | For country determination (based on partner’s address) for break start/sequence determination when splitting WBS service calls time efforts (see customizing transactions /PACG/ECM_PSTAR - Break start time, /PACG/ECM_PSEQN - Break sequence)

·       During generation/update of WBS-based activities | For partner determination for WBS-based activities if no partners found based on settings Sold-to/Ship-to in /PACG/ECM_SCTD

·       During inbound processing of notification-based activities | To get /PACG/ECM_ACTI-KUNWE partner from sales document if no partner determined in notification

·       During processing of various network-related objects | Get partners from sales document if none found in the WBS element 

Work center source

Specify a source for determining work center and saving it to order/operation in case of service call/operation creation from SAP FSM.

The available options include:

  • Person

  • Service Order, Default (priority order - service order work center searched first, the default taken only if the service order’s work center not found)

  • Person, Service Order, Default

  • Equipment, Service Order, Default

  • Equipment, Person, Service Order, Default

  • Default - the work center/plant value from transaction /PACG/ECM_SCTDD will be used.

  • Service Order, Person, Default

  • (S4)PACG 200 SP04 Func. Loc., Equipment, Service Order, Default

Functional location’s work center can be found in transaction IL03, tab ‘Organization’

 

For new activities created in FSM, functional location from service order header is considered.

 

Functional location’s work center is used as the new operation’s work center:

 

For service calls created in FSM, functional location added to the service call is considered.

 

Functional location’s work center is used as the new service order’s work center:

 

  • (S4)PACG 200 SP04 Func. Loc., Equipment, Person, Service Order, Default (see the option above for examples)

(S4)PACG 200 SP04 Overwrite service order operation's work center

During processing of inbound activities a work center is determined for assigned technician (if there is any). When this option is enabled, work center found for technician will OVERWRITE work center of operation the activity is assigned to.

When this option is disabled, the determined work center will be saved in the activity object only

This is not relevant when 'multiple activity on single operation' scenario is enabled.

Act. operation

LONG LABEL Allow oper. update based on FSM changes

Update order operation from changes onfinal conf connected service assignment (work center, person, start, end)

No new oper.

LONG LABEL No new oper. for duplicated/new act. 

[ ] - Generate new operations for duplicated/new activities

After duplicating/creating an activity in SAP FSM, a new operation is created in the related service order. The new activity is linked to the new operation.

[X] - Do not generate new operations for duplicated/new activities

After duplicating an activity in SAP FSM, the new activity is linked to the same service order operation as the first one. No new operation is created.

(S4)PACG 200 SP04

If a new activity is created in FSM and fields source activity/origin activity are not filled, the first relevant operation is searched for. Relevant operation means control key is active and there is no exclusion of work center. See also transactions and .

Change equi

LONG LABEL Action after scall equip. update in FSM 

Specify whether the change of equipment is allowed in service call on the FSM side (allowed if “Change equi” set to other than ‘Do not create object’). Multiple equipments will be added to the object list of the header.

Specify whether equipment added to activity in FSM should be added to ‘Objects’ list of the service order (if “Change equi” set to ‘Create object’).

(S4)PACG 200 SP07/NOTE 3265325

When equipment is maintained in SAP ECC/S4 via Object assignment, equipment added to activities in FSM/inherited from copied activities will be properly populated to the operation. In order to create an object with link to the operation, make sure to select ‘Create object’ in field ‘Change equi’.

(S4)PACG 200 SP10

When the value ‘Create object’ is selected and equipment is removed from an activity in FSM, the corresponding object list entries in the service order will be removed only if they’re not linked to any notification. This replicates the standard SAP behaviour where object list entries with reference to a notification cannot be deleted in IW32.

No technician

LONG LABEL Oper. pernr not populated to activities 

This setting is used to remove a personnel number from an operation during activity creation/update. The person will not be populated to the activity. This is needed if there is more than one activity assigned to one operation.

No work/dur

LONG LABEL No oper. work/duration update from FSM

Checking this setting denies update of an operation’s work and duration after change of an activity in SAP FSM.  

Please refer to for more information.

It’s also necessary to use operation’s duration as activity duration and work as planned duration, when sending activities to FSM.

Dates Alloc.

LONG LABEL Scall start/end and Act. earl.start/due

Specify logic for dates allocation (start date and end date) in service call (and in activity). Available options are:

  • B - basic dates - when the setting is set to basic dates, then the dates Bsc start and Basic fin. from Service Call Header are taken into account and sent to FSM

The following data is sent in fields Start and End of a segment /PACG/ECM_IS_SERVICECALL_2 of message type /PACG/ECM_SERVICECALL:

  • S (space, default value) - scheduled dates - when the setting is set to scheduled dates, then the dates Earl start from the earliest operation and Latest fin from the last operation are taken into account and sent to FSM. The date from the earliest operation is set as Start date and the date from the latest operation is set as End Date.

The following data is sent in fields Start and End of a segment /PACG/ECM_IS_SERVICECALL_2 of message type /PACG/ECM_SERVICECALL:

Note: Similar logic is applied to activity dates - when B basic dates is set, then the dates from order header are taken into account and sent as activity start and end date. If S scheduled dates is set, then the earliest start and the latest end dates specified for each operation are sent.

(S4)PACG 200 SP06 Work/dur unit

LONG LABEL Stand. conf as work/dur unit for new op

When enabled, new operations for activities created in FSM will use duration/work unit determined from standard SAP customizing.

 

This is especially useful if units ‘HR' (STD) are used in the system (instead of 'H’) and should be set in new service order operations to avoid inconsistencies in FICO documents.

 

The following customizing is considered:

  1. First - units from transaction OIO9 are retrieved based on the planning plant of the service order:

 

2. If no unit was found, the default time unit from work center (determined based on customizing in field ‘Work center source’) is used:

 

3. If not found, the default time unit of the work center's activity type (activity type for internal processing) is used:

 

4. If no other unit was found, 'H' would be used.

Meth Usr Tclose

LONG LABEL Store FSM TECO user in Sort Field 

This field indicates whether the the cloud user who technically competed the order in FSM should be stored in the field "Sort field" in Location tab in Change/Display Order transactions: IW32/IW33 or not.

Please note that the current logic for this field is depended on the changelog entries. Starting from release 2105, the logic has been amended and changelog entries are no longer required for correct processing.

No zero confirmation (formerly ‘No final conf.’)

LONG LABEL Confirmations always final  

If checked, zero confirmations (always set as ‘final’) will not be created after checkout.

SA Fin Confirm

LONG LABEL Finalize confirmations after checkout 

Confirmations will be automatically finalized after checkout.

 

If the setting is set to yes, then status ‘closed’ is set to activities if the related service order has a system status which is defined as “outstanding” in transaction /PACG/ECM_SCSTD (field S.A. generation).

Check IDOCs

Check not processed IDOCs for service order. If the setting is set to yes, then not processed IDOCs for service order are checked after service order checkout.

PurchaseFromNotific

LONG LABEL Use PO data from notif. instead of SO 

Send the purchase order ref. no. and its date from the notification with the service order. If the flag is checked, then PO number and date from notification are being sent. If the flag is not checked then PO number and date from service order are being sent.

The notification has been created with the below PO data:

PO data has been manually changed on the service order.

If the flag PurchaseFromNotific is checked, then the PO number and date from the notification are being sent.

If the flag is not checked, then PO number and date from service order are being sent:

 

Subject source

LONG LABEL S.Call Subj source

Define how the subject of the service call in FSM is determined:

  • Short text: This will send only the first line of the long text in the SAP ERP service order before the carriage return. FSM is able only to accept up to a max of 512 bytes for the service call header subject.

  • Long text: This will send all the lines entered in the long text of the SAP ERP service order up to a max length of 512 bytes for the service call header subject.

NotifLongtext

LONG LABEL Add Notif LongText

This setting determines whether notification Long Text should be sent together with the service order long text in service call remarks.

  • for service calls sent from SAP to FSM - concatenate service notification long text with service order text. In this case the text is doubled

  • for service calls received from FSM - no update of text in service order (because of the previous point)

 

 

In case when the flag is not set: only service call long text (notif line 1, notif line 2, service call line 1) is populated in service call remarks (except for the first line as Keep 1st line in remarks is not set):

 

In case when the flag is set: the notification long text (notif line 1, notif line 2) is added and populated after the service call long text (notif line 1, notif line 2 service call line 1):

(S4)PACG 200 SP05 Complete text

LONG LABEL Compl. long text of oper. into act. rem.

If this flag is checked during ASA (creating activity) process then long text operation will be fill into activity remarks.

During activity inbound process (creation or update of operation) the complete activity remarks will be stored into operation long text. This feature works for service orders and PM orders.

Long text can be entered by pressing button next to Operation field. When long text in operation is filled, then first 40 letters will be the title of operation. In FSM activity topic is taken from operation field in SAP. The rest of long text including the first line (40 letters) is submitted to Remarks of activity in FSM.

There is example on service order:

 

Protected text

LONG LABEL 1st line in SO header not updateable 

Protect first line in header long text. If the setting is set to yes, then the first line in service order header will not be updateable.

Note: This setting works properly provided that there is only one default service order per company.

No inc.text

Specify whether the incoming long text should be saved.

In the below example the subject source is set to short text in both cases, which means that the only first line of the long text can be saved in the subject of a service call.

In case when set to YES, the incoming long text is not saved in the subject of the service call – only the short description is saved:

In case when set to NO , the whole first line of the long text is saved in the subject of the service call:

Keep 1st line in rem:

In case when this flag is checked, then the first line of the service order description is kept in remarks in service call in FSM. In case the flag is not checked, then the first line is skipped and not kept in remarks in service call in FSM.

Orders' header long text to acti remarks (/Hdr ltext to remarks)

With this option enabled for newly created activities in ECC/S4 (backend) text from an order’s header is added to the remarks. It is concatenated with a long text of an operation.

When activity is created in the FSM and this option is enabled then an order’s header text is added to the remarks of an activity during inbound processing but only if remarks were empty. Then is stored in an operation’s long text and synced back to FSM

 

Planning status

LONG LABEL Op. User status after activity assign. 

User status for external assignment planning status

If inbound activity is planned and assigned to a person/technician then a predefined user status will be set on operation level.

Unassign status

LONG LABEL Op. User status after activity unassign. 

If an activity is unassigned in FSM, the hereby set user status will be set in the service order, on operation level. See also fields “Planning status” and “Cancelled status”.

Prerequisites - status profile already set for the operation; “Planning status” also entered in the hereby described transaction.

Cancelled status

LONG LABEL Op. User status after activity cancel. 

If an inbound activity has status ‘closed’ and its checkout value is ‘false’ (meaning it was reassigned/unassigned/cancelled, not finished), a predefined user status is set on operation level.

(s4)PACG200 SP05 Unproc.Idoc Stat
(User Status for Unprocessed Idocs)

LONG LABEL SO User Status for unprocessed Idocs 

If processing of an inbound cost-relevant object related to a Service Order (or one of its activities) fails, a user defined status can be set in the header of a service order. The functionality applies to inbound time efforts, expenses, mileages, material consumption, stock transfers, checklist instances, batches and work time.

This functionality gets enabled immediately after selecting status in the configuration and analogically gets disabled when config field gets cleared


Unprocessed (e.g. failed) idocs related to service orders (or one of its activities) can be also added as a menu GOS entry and then reviewed before completing the billing processes in the back office. 

 

To enable it, add an entry in table SGOSATTR (transaction SM30):

SO St. MDOC f

LONG LABEL SO User Status for failed GM 

This field indicates user status which is set in the service order if a goods movement runs into errors and waits in COGI for manual treatment.

 

Sold-to

LONG LABEL Customer role 

When service calls are sent to FSM, their Business Partners/Customers are determined from the partner function entered in this field. This partner function would also store service call’s Business Partner added in FSM. By default, when left empty, the function SOLD-TO is used. It can be overwritten with SHIP-TO for instance.

Ship-to

This field provides the ability to use custom business partner functions for customers who utilize Z-functions and want to have them sent to the cloud (related to activity)

Respons person role

This field specifies which partner role should be sent as responsible person of service order to the cloud. If responsible person is entered in FSM, it will be stored in the related order as the hereby provided partner function. The partner function can be personnel number-based or (S4)PACG 200 SP11 user name-based.

PartRole Leader

Specify partner role for the leading technician on site that will be sent to cloud.

 

RmatAct

LONG LABEL ResMat with reference to activity

Specify if reserved material is sent with reference to an activity/operation, not a service call.

Do not send R RMAT

LONG LABEL Transfer of 'R' Res. Mat.

  • Send “R” Reserved Materials to the cloud - send materials with status R (saved in table RESB) to the cloud

  • Do not send “R” Reserved to the cloud - don’t send materials with status R (saved in table RESB) to the cloud

  • Avoid sending of “R” RMATs with Res./Purc. req set as Never - if Res./Purc. req. is set as never in component reservation then don’t send R reserved material to the cloud

 

(S4)PACG 200 SP10 No Van Stock

‘Disable’ van stock. This means that plant with selected storage location can be used also for SD/DC scenarios and warehouse owners are not required.

When a reservation is made and this checkbox is active, instead of a van stock reservation, a standard reservation on technician's storage location will be created (/PACG/ECM_ARMAT entry with advanced shipment type = ' '). Such approach provides to that functionality can also be used for older service packs (SP4 and lower).

 

TAT active

LONG LABEL Send activity types as time tasks 

Field TAT Active - Activity Types of the Service Call Task - active specifies whether controlling activity types should be used for time confirmation. If the setting is set to yes, then activity types defined in transaction /PACG/ECM_SOLAF are sent as time tasks per order.

Split conf

Specify if time efforts should be split before posting confirmation/CATS entry. This setting is checked during inbound time effort processing. For the splitting to be performed, it should be active for a given company and order type.

The splitting involves cutting one time record into two or more, each with different activity type and/or attendance/absence type. The splitting rules are defined in transaction .

An example of such a rule - time effort recorded on Mondays from 8:00 - 16:00 should be posted with activity type 101, entries recorded on Mondays from 16:00-18:00 should be posted with activity type 102.

No TZ con.

No Time Zone Conversion - By this setting the submitted time is interpreted as local time.

Pre-Condition: All mobile devices stay always in the same time zone. If you set "No TZ conv." The first step of the time zone conversion (converting into SAP system time zone) will be not performed.

Act. Type as TT

LONG LABEL Use time tasks’ act. type for conf./CATS

Specify whether Activity type should be sent as time task.

Not for person

LONG LABEL No time task for person 

Do not send time task for person – if active and corresponding permission in FSM, also not assigned technician can report time effort to activity.

Send Time Task

LONG LABEL Generate time task for order operation 

Send order operation as „task" for time effort capturing.

 

Send Attachment

LONG LABEL Transfer SAP attachments to FSM 

Specify if Attachments should be sent.

(S4)PACG 200 SP07 Cpy.Att.To.Notif

LONG LABEL Copy scall att. from FSM to notif. 

Specify whether attachments created for service calls in FSM should be automatically copied to the related notification in SAP ECC/S4.

(S4)PACG 200 SP07 Cpy.Att.To.Acti

LONG LABEL Copy scall att. from FSM to activities 

Specify whether attachments created for service calls in FSM should be automatically copied to the related activities.

 

Generate FSM activity (formerly SalesActGener)

This field indicates if service assignment (activity) should be generated in SAP per order operation. If this is not set, then the message type "/PACG/ECM_ACTIVITYOUT" will not be sent and a service call will be created in FSM without an activity. Disable this option only in justified circumstances.

Assessment Date

LONG LABEL Activity planned start/end date 

Specify which service order dates should be taken over to assignment activity when resource planner is not used. Available options include:

  • Early Dates : Earliest scheduled start/end

  • Late Dates : Latest scheduled start/end  

Note: If the Restriction dates are maintained, this customising is not considered. The Restriction dates are taken over.

Activity Adress

Specify which address should be taken over to assignment activity when resource planner is not used.

Please note that for service orders created in cloud only service order address allowed.

(S4) PACG 200 SP02 Release Activity

LONG LABEL Automatically dispatch/release activity

Automatically dispatch/release activities on the planning board in FSM if a technician was entered in the related operation.

  • Release - automatically release an activity on the planning board

  • Plan - automatically dispatch an activity on the planning board, it then has to be manually released

  • No assignment/release - the activity will be visible in the activity list

The source of technian assignment depends on field “Use req. ass” in this transaction. If inactive, then operation’s personnel number will be used, otherwise requirement’s assignments. Please note that this setting has impact only on new activities - if an activity is released in FSM and then reassigned in SAP, its status will remain released, even if “Release activity” is set to plan or no assignment.

(S4)PACG 200 SP04

If a technician was assigned to an activity directly in SAP ECC/S4 (field ‘Release activity’ in transaction /PACG/ECM_SCTD) and then unassigned from the service order operation, the special UDF COR_CLOUD_AssgPlan in the activity idoc will be set to ‘UNASSIGN’. Consequently, after removing technician from a service order operation, the activity moves back to the activity list.

DT order header

LONG LABEL Activity start/end from order header 

Specify if Activity date/time should be derived from order header. If this option is checked activity date and time will be taken from basic dates from order header. If box is not checked program will try find dates with logic as below:

End calc. type

LONG LABEL Calculation of activity end time

Specify End date/time calculation type. This field controls the way how end time of activity is calculated. Available options are:

  • No Calculation – leaves values as they are (self-explanatory) 

  • Add work – if this option is selected and work time is not initial, then activity’s end time is calculated in a following way: Activity.StartTime + WorkTime 

  • Add duration - if this option is selected and work time is not initial, then activity’s end time is calculated in a following way: Activity.StartTime + DurationTime 

PlanDur Type

Specify planned duration type. This field controls span of the activities. The available options are:

  • Not defined – same as Manual 

  • AUTOMATIC - The Planned Duration is derived as PlanEnd - PlanStart - non-working hours

  • MANUAL - The Planned Duration is derived as PlanEnd - PlanStart, any reservation, non-working hour is not considered. This is the usual way the system behaves as per today. 

  • MANUAL_FIX - This is the same as MANUAL with the only difference that the planner cannot switch to AUTOMATIC mode. This is relevant for specific activities coming from the ERP. 

Please refer to for more information.

 

Obsolete fields

OBSOLETE No problem text

Obsolete field. Hidden in SP5 for add-on 200.

Obsolete SendChangeLog

If this setting is set, service call changelog from SAP FSM will be stored and sent back to SAP FSM.

OBSOLETE Show in Comp

Obsolete. Hidden in SP5 add-on 200.

 



If you'd like to help us improve the documentation, please provide your feedback using the communication channels listed /wiki/spaces/PFCC/pages/1561427969. Learn about support possibilities here.