Table of Contents | ||||
---|---|---|---|---|
|
Note |
---|
After installing the service pack please install SAP NOTE 3114019 Before running SETUP logs are not displayed |
Post-installation steps
Run /PACG/ECM_SETUP
In transaction /PACG/ECM_CLSASSIG - E4C Outgoing Messages Configuration change setting for message /PACG/ECM_EQUI and set IDOC creation class to /PACG/ECM_CL_S_IDOC_O_EQUI2
In transaction /PACG/ECM_ACTIVE check if all the settings related to setting up the references between activities' attachments meet your requirements
If you intended to use new feature “multiple activities linked to single service order operation” please check the documentation
New features
Category | Feature description |
---|---|
Service order/Activities |
Learn more: /PACG/ECM_SAS – Serv. Assignment Status Customizing
|
Reserved materials | ‘Book component’ option in service order settings of FSM Cloud Connector causes addition of new reservation for material in case of so-called ‘unplanned consumption’. The new reservation was also created if there was already one for a given material. Due to customers’ request, this has changed. Now, in case of unplanned consumption, FSM Connector first checks if there is already a reservation for a material and creates it there is none. |
Materials | Additional way of determining if a material is batch-managed - this new feature has a significant impact on the determination of batchable/non-batchable materials but specially the latter. Default determination was the following: check general material data, check plant material data, and check valuation of material. Even if material was set as non-batchable but valuation was found, it was sent as batchable. A new configuration option was introduced. If enabled, the valuation is not checked and only material’s settings are considered. |
Expenses | Until now, when posting expenses using cost center, the cost center was determined based on either work center of the person (technician) or simply the fixed value stored in the customizing was used. A new option was introduced - it will also be possible to use cost center determined based on the activity type. |
Performance |
Learn more: Send the list of FSM objects supported by FSM Cloud Connector
|