Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The following reserved material scenarios are supported for WBS integration:

Table of Contents

 

Materials can be consumed for the first WBS element found set as ‘billing’ (down-top structure from the activity WBS upwards).  If no billing element WBS found, document material reference will use object reference from the idoc. If field ‘Book component’ is set in transaction /PACG/ECM_SCTDW - WBS (Service call) - Movements type, WBS’s reservations are checked, a document material is created with reference to the found reservation.

UNPLANNED CONSUMPTION

 

 

 

 

MB21 RESERVATION (RESERVATION ON TECHNICIAN’S STORAGE LOCATION)   

 

 

DC RESERVED MATERIAL    

 

MM RESERVED MATERIAL