Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

After successfully Post Goods Issue, the outgoing LORMAT Idoc and second entry in table /PACG/ECM_LORMAT will be generated:

...

Material consumption

For consumption process recommended movement type is 101 in material settings /PACG/ECM_VLOTD:

...

After the reserved material is consumed in the FSM, simultaneously with the incoming idoc, a confirmation is created on the Service Order:

...

Inside Confirmation, the material document is visible:

...