Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info

SAP S4/HANA Service Order integration is available with the Connector S4PACG 300 version

Status
titleS4PACG300

Within first S4PACG300 integration version, the FSM Cloud Connector supports handling of Lean Service Order in following areasIntegration scope:

  • Service Order and Activities transfer in both direction SAP<=>FSM

    Status
    titleS4PACG300

  • Attachments on Service Order header

    Status
    titleS4PACG300

  • Time efforts

    Status
    titleS4PACG300

  • Material consumption

    Status
    titleS4PACG300

  • Material Reservation (only usage)

    Status
    titleS4PACG300 SP01

  • Checklist prefilling

    Status
    titleS4PACG300 SP01

  • Expenses

    Status
    title(S4)PACG 300 SP02

  • Mileages

    Status
    title(S4)PACG 300 SP03

The provided solution by FSM Cloud Connector is based on SAP Best Practices. Please follow by instruction in SAP documentation to set up system correctly.

...

Prerequisites

It is recommended to run setup program /PACG/ECM_SETUP before using integration - some required entries in settings will be automatically added. To enable Lean Order integrations there are some necessary steps to maintain in the system:

...

  1. Controlling – Documents can be posted in KB16n or KB23n.

  2. Confirmation – There are 2 possible ways for posting:

    1. Expenses are saved as confirmations directly within the SAP S4/HANA Service Order. The option ‘S4 confirmation for expenses’ in /PACG/ECM_CPROP must be activated.

    2. Expenses are saved as confirmations in the ‘old’ way via transactions IW43. The option ‘S4 confirmation for expenses’ must be deactivated.

  3. FI (Financial) – Documents can be posted to the Finance area using FB03.

...