Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note

Reserved material integration do not supports functionality ‘Take to own stock’ in FSM at this moment.

Tip

To process reserved materials, a dedicated /PACG/ECM_CL_SRV_NOT_RMAT class must be added in SPRO => Service => Transactions => Additional Settings => Notification Class for Transaction Type

Reservation on technician storage location

...

The material document for consumption process will be available in transaction history on Confirmation:

...

MM Reservation

image-20240918-104905.pngImage Added

  1. Entry in /PACG/ECM_VLOAST with relevant Object type for material and Item category must be assigned to Shipment type 'N':

...

  1. Entry in /PACG/ECM_IWLON with movement type 101 and 641:

...

  1. Entries in /PACG/ECM_RMGM must be adjusted to material movement for stock transfer:

...

Reservation process

The relevant Item category from /PACG/ECM_VLOAST must be select in Service Order:

...

After releasing order, the purchase requisition will be created and visible in Transaction History:

...

The next step is creating Purchase Order with reference to purchase requisition via ME21N transaction. Document type must be ‘Stock Transport Order’:

...

Navigate to VL10B and select new Purchase Order and click ‘Background’ button do create delivery. Navigate to delivery log creation and display created delivery documents:

...

Enter Picked Quantity, then Post Goods Issue to create material document:

...

After successfully Post Goods Issue, the outgoing LORMAT Idoc and second entry in table /PACG/ECM_LORMAT will be generated:

...

Material consumption

For consumption process recommended movement type is 101 in material settings /PACG/ECM_VLOTD:

...

After the reserved material is consumed in the FSM, simultaneously with the incoming idoc, a confirmation is created on the Service Order:

...

Inside Confirmation, the material document is visible:

...