Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Next »

A new concept introduced with the Dispatch Monitor is the Allocation Access Sequence. It allows third party-apps to consume the allocation date from SRS and the Dispatch Monitor in a filtered and pre-sorted way. The access sequence is called from external parties using a central class.

Allocation and reallocation of ‘Day-Based’ Appointments in Dispatch Monitor: 

The process below depicts the use of ‘Dispatch Monitor’ for initial allocation of demand arising out of Day based planning to a resource as well as reallocation of a demand to a different resource for optimal workshop setup for a given day.

  1. Access the ‘Dispatch Monitor’ application

  2. Application settings mentioned below can be considered for usability.

    1. Select the desired workshop hierarchy using the icon below highlighted (found on the top right corner)

  • No labels