If a break is entered for a time effort or work time, it will be indicated in SAP ECC/S4.
Time splitting disabled
Time posted as a confirmation | Time posted as CATS entry |
---|---|
A break is indicated by decreased Actual Work value. Work start/finish are not affected. | The posting is divided into two:
|
Time splitting enabled
(see e.g. /PACG/ECM_CSPLIT - Time Effort - Time Frames for Activity Type)
Time posted as a confirmation | (S4)PACG 200 SP11 Time posted as CATS entry |
---|---|
A break is indicated by decreased Actual Work value for one of the confirmations (splits). | One of the CATS entries (splits) is divided into two:
|
Determination of the relevant split for break inclusion follows the rules below:
1. based on customizing /PACG/ECM_PSTAR - Break start time or /PACG/ECM_PSEQN - Break sequence
2. if neither of the above is maintained, the break is applied to the first split