The previous steps: Configure generation of prefilled checklists
After filling the measuring point readings by a technician and finishing the checklist, the checklist data is transferred to SAP ECC/S4. The measurement reading can be retrieved and used to create new measurement documents for the relevant measuring points.
Measurement reading posting should be implemented as a customer-specific solution, using one of the following approaches:
Use the inbound checklist mapping customizing (transaction /PACG/ECM_VCLCNY - Checklists mapping customising or /PACG/ECM_VCLCNZ - New checklists mapping customising) and implement your custom logic in a Z-class created based on interface /PACG/ECM_IF_A_CHKL_MAP_PROC
Implement your custom logic in BAdI /PACG/ECM_CHECKLIST_BEF_COMMIT (method DATA_BEFORE_COMMIT), which is called when a checklist instance object is saved in the database, just before the commit.
Inbound checklist mapping customizing
Transaction /PACG/ECM_VCLCNY - Checklists mapping customising or /PACG/ECM_VCLCNZ - New checklists mapping customising) can be used to maintain inbound checklist mapping.
Mapping class
Create a Z-class which will be called during inbound checklist instance processing. The class should implement interface /PACG/ECM_IF_A_CHKL_MAP_PROC (method PROCESS_DATA_BEFORE_INSERT).
Its name should be entered as ‘Class/Interface’ in the mapping customizing.
Field mapping
Create a structure (to be entered as 'Table name') with which checklist template fields will be mapped. Then maintain the mapping in the checklist mapping customizing.
Create a measuring document
Use method PROCESS_DATA_BEFORE_INSERT of your Z-class to implement measurement reading posting. For all measuring points retrieved from the checklist instance (mapping is passed as parameter it_data), post a measuring document with method /PACG/ECM_CL_A_MEASURING_POINT=>CREATE_MEASURING_DOC_SINGLE. The following parameters should be exported to it:
Parameter | Description |
---|---|
iv_measurement_point | Measuring point |
iv_reading_date | Reading date |
iv_reading_time | Reading time |
iv_recorded_value | Recorded value |
iv_work_order_objectnr | E.g. a reference service order |
Make sure that the processing finishes with a commit.
BAdI /PACG/ECM_CHECKLIST_BEF_COMMIT
BAdI /PACG/ECM_CHECKLIST_BEF_COMMIT, method DATA_BEFORE_COMMIT is called when saving a checklist instance object in the database, just before the commit. It has access to checklist data header, positions or attached objects.
The mapping between checklist template fields and a structure used for creating measurement documents should be implemented directly in the code. For all measuring points retrieved from the checklist instance, post a measuring document with method /PACG/ECM_CL_A_MEASURING_POINT=>CREATE_MEASURING_DOC_SINGLE. Make sure that the processing finishes with a commit.