  1. Access the ‘Dispatch Monitor’ application

  2. Application settings mentioned below can be considered for usability.

    1. Select the desired workshop hierarchy using the icon below highlighted (found on the top right corner)

...

b. Appointments scheduled can be refreshed using the icon to the left to reflect up-to-date data on the screen.

c. Select the date (day) for which the allocation needs to be planned.

image-20240322-130430.pngImage Added

d. Select the resource roles which are applicable for planning in current session.

image-20240322-130529.pngImage Added

e. Hover mouse over icon highlighted to get order details.

\

f. Hover mouse over the resource available time to check more availability details.

...

  1. Unallocated appointments can be drag and dropped to the required technician. The colour coding (displayed in green slots) signifies resource availability. This function also ensures that the right demand is allocated to right resource.

image-20240322-130759.pngImage Added

  1. Once allocated the availability of the resource is recalculated based on the planned duration of the demand. The message (bottom left) confirms the success or failure of allocation.

image-20240322-130832.pngImage Added

Reallocation of ‘Time-Based’ Appointments in Dispatch Monitor:

The process below depicts the use of ‘Dispatch Monitor’ for reallocation of demand to another resource arising out of Time Based planning for efficient set up of a workshop considering the total capacities.

Please note that the initial allocation for time based appointments is done using Workshop planner (not shown in process steps below)

  1. Access the ‘Dispatch Monitor’ application

  2. Application settings below can be considered for usability.

    1. Select the desired workshop hierarchy using the icon below highlighted (found on the top right corner)

image-20240322-130942.pngImage Added

b. Appointment scheduled can be refreshed using the icon to the left to reflect up-to-date data on the screen.

c. Select the date (day) for which the allocation needs to be planned.

image-20240322-131019.pngImage Added

d. Select the resource roles which are applicable for planning in current session.

image-20240322-131108.pngImage Added

e. Hover mouse over icon highlighted to get order details.

image-20240322-131138.pngImage Added

f. As Time-Based appointments are already planned using Workshop planner you can find the technician already allocated for this task

image-20240322-131442.pngImage Added

  1. Time-Based appointments which are already allocated to the resource can be reallocated e.g. technician not available due to illness or unplanned leave. Using the drag and drop function.

image-20240322-131518.pngImage Added

a. After reallocation, the availability of the resources is recalculated to reflect the current state based on the planned duration of the demand.

...

  1. Reallocated appointment is also reflected in the ‘Workshop Planner’ for time based (planned) allocations.

...

Changing priorities

 

  1. Priorities can only be changed for allocated demands

  2. Right click on a allocation to open the context menu, select “Change priority”

...

  1. From the dropdown, choose the new Priority value

...

  1. Priority is updated and colour may change

...

  1. The priority is now visually visible and can be considered in the Access Sequence as a Sorting criteria