Below are presented and explained:
- Overview of orders
- Search/reload functionality
- View settings
- Configurable lists
- Function
- Detailed view
- Possibility to select demand for rescheduling
- Jump to other apps
- Log with details
Table of Contents | ||||
---|---|---|---|---|
|
Overview of orders
To-do Basket - Overview
...
So the general rule is: even if you mark the given demands as relevant for rescheduling, still the whole order is rescheduled (with the attempt to keep the allocations of unselected demands unchanged).
Planning Parameter: Maximal Duration
The maximum duration is an additional planning parameter, that the user can provide on the date screen. The User can provide the maximum total duration as a new constraint for the planning. The VSS SRS Planning Engine tries to find an available appointment slot, where the total duration of the appointment will not exceed the maximum duration specified by the user.
If the search is not successful, the user receives feedback.
Since the new release it is possible to enter the maximum appointment duration. It is the maximum duration of the allocation which may be proposed by the planning procedure. If the allocation may not be proposed (the visit time cannot be found which would meet the constraints), the corresponding error message is issued. Maximum appointment duration can be provided both while creation of the order and when rescheduling the existing order.
Jump to other apps
To-Do Basket - Jump to other apps
...