Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

The following reserved material scenarios are supported for WBS integration:

Materials can be consumed for the first WBS element found set as ‘billing’ (down-top structure from the activity WBS upwards).  If no billing element WBS found, document material reference will use object reference from the idoc. If field ‘Book component’ is set in transaction /PACG/ECM_SCTDW - WBS (Service call) - Movements type, WBS’s reservations are checked, a document material is created with reference to the found reservation.

Before continuation, please make sure to have read the following page: RESERVED MATERIALS for WBS element integration

UNPLANNED CONSUMPTION

 

MB21 RESERVATION (RESERVATION ON TECHNICIAN’S STORAGE LOCATION)   

 

DC RESERVED MATERIAL    

 

MM RESERVED MATERIAL  

 

  • No labels