Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 22 Next »

The previous steps: Configure generation of prefilled checklists

After filling the measuring point readings by a technician and finishing the checklist, the checklist data is transferred to SAP ECC/S4. The measurement reading can be retrieved and used to create new measurement documents for the relevant measuring points.

Measurement reading posting should be implemented as a customer-specific solution, using one of the following approaches:

Inbound checklist mapping customizing

Transaction /PACG/ECM_VCLCNY - Checklists mapping customising or /PACG/ECM_VCLCNZ - New checklists mapping customising) can be used to maintain inbound checklist mapping.

Mapping class

Create a Z-class which will be called during inbound checklist instance processing. The class should implement interface /PACG/ECM_IF_A_CHKL_MAP_PROC (method PROCESS_DATA_BEFORE_INSERT).

Its name should be entered as ‘Class/Interface’ in the mapping customizing.

Field mapping

Create a structure (to be entered as 'Table name') with which checklist template fields will be mapped. Then maintain the mapping in the checklist mapping customizing.

Create a measuring document

Use method PROCESS_DATA_BEFORE_INSERT of your Z-class to implement measurement reading posting. For all measuring points retrieved from the checklist instance (mapping is passed as parameter it_data), post a measuring document with method /PACG/ECM_CL_A_MEASURING_POINT=>CREATE_MEASURING_DOC_SINGLE. The following parameters should be exported to it:

Parameter

Description

iv_measurement_point

Measuring point

iv_reading_date

Reading date

iv_reading_time 

Reading time

iv_recorded_value

Recorded value

iv_work_order_objectnr

E.g. a reference service order

Make sure that the processing finishes with a commit.

BAdI /PACG/ECM_CHECKLIST_BEF_COMMIT

BAdI /PACG/ECM_CHECKLIST_BEF_COMMIT, method DATA_BEFORE_COMMIT is called when saving a checklist instance object in the database, just before the commit. It has access to checklist data header, positions or attached objects.

The mapping between checklist template fields and a structure used for creating measurement documents should be implemented directly in the code. For all measuring points retrieved from the checklist instance, post a measuring document with method /PACG/ECM_CL_A_MEASURING_POINT=>CREATE_MEASURING_DOC_SINGLE. Make sure that the processing finishes with a commit.

  • No labels