Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

TIME EFFORTS

Order confirmation/CO11N posting

To post time efforts as order confrimation, make sure that ‘CATS Active' is disabled in transaction /PACG/ECM_CTET - Time posting settings

Create a new time effort for PP order activity on the FSM mobile app.

image074.pngImage Added

Time confirmation is created in the order and operation status is changed to PCNF

image076.pngImage Added

Order header status is changed to PCNF.

image078.pngImage Added

CATS

To post time efforts as order confrimation, make sure that ‘CATS Active' is enabled in transaction /PACG/ECM_CTET - Time posting settings

Create a new time effort for PP order activity in FSM mobile app.

image081.pngImage Added

CATS entry created in CAT3:

image083.pngImage Added

Operation status changed to PCNF in PP order and hours not updated:

image085.pngImage Added

MATERIALS

Reserved Material settings

Use transaction /PACG/ECM_VPPSCTD - Prod order service call types def. – Material settings to customize movement types for stock transfer and usage.

image087.pngImage Added

Add the following entry for the production plant in the transaction https://proaxia-prod-doc.atlassian.net/wiki/spaces/PFCC/pages/31954033 :

image089.pngImage Added

Add movement types 261 and 262 in the transactions https://proaxia-prod-doc.atlassian.net/wiki/spaces/PFCC/pages/31954077 and /PACG/ECM_IWLON - Goods Movement - send online

image091.pngImage Addedimage093.pngImage Added

Reserved Material creation - DC scenario

Create a production order from CO01 and find the reservation number in Assignment tab.

image095.pngImage Added

Post goods issue for this reservation in transaction MIGO:

image097.pngImage Added
image099.pngImage Added

Two entries created for each material in table /PACG/ECM_ARMAT, shipped quantity filled for the ‘M’ entry: 

image101.pngImage Added

Reservation is transferred to SAP FSM: 

image104.pngImage Added

Reserved material can be found on the activity level

image105.pngImage Added

Stock transfer - DC scenario

Take 1 piece to own stock:  

image108.pngImage Added

Select the required SLoc to which the material is transferred and click on transfer.

image109.pngImage Added

Inbound stock transfer idoc processed correctly:  

image112.pngImage Added

The following material document was created

image115.pngImage Added

Transfer is indicated also in table /PACG/ECM_ARMAT:

image116.pngImage Added

Material consumption - DC scenario

In this scenario, material consumption in SAP FSM will not cause any material movement because a goods issue was already posted.

image129.pngImage Added
image131.pngImage Added
image133.pngImage Added

Reserved Material usage is also indicated in table /PACG/ECM_ARMAT:

image135.pngImage Added

Material consumption - unplanned consumption

In this scenario, no reserved material is created beforehand. The movement type 261 is set in transaction /PACG/ECM_VPPSCTD - Prod order service call types def. – Material settings for unplanned consumption.

image118.pngImage Added

Create a material on the FSM mobile app for the PP order activity.

image120.pngImage Added
image122.pngImage Added

Inbound goods movement idoc is processed correctly. It points to the number of the new material document.

image124.pngImage Added
image126.pngImage Added

The following material document with reference to the PP order was created:

image128.pngImage Added

PREFILLED CHECKLISTS

Use transaction https://proaxia-prod-doc.atlassian.net/wiki/spaces/PFCC/pages/1166737418 to automatically generate prefilled checklist instances for PP order activities. The instances will be filled with data retrieved from SAP ECC/S4 tables, based on configurable mapping. Build a set of rules based on which a checklist instance will be assigned to an activity.

To trigger generation of a checklist instance referring to an activity, the following criteria should be met:

  • The activity has status ‘OPEN’

  • The activity has a technician assigned 

  • The conditions specified in the view cluster are met

Use the following structures dedicated to PP order to prefill checklists:

·       T_SCALL_PRODORD_COMP

·       S_SCALL_PRODORD_OPER

Fields ‘Excl. status’ and ‘1st operation’ in node ‘Technical cond assignment’ are not supported in PP integration.

image137.pngImage Added

Condition search help was adjusted to PP integration:

image139.pngImage Added

An example prefilled checklist

Checklist assignment in /PACG/ECM_CL_PREF:

image141.pngImage Addedimage143.pngImage Added

After activity assignment in FSM, a checklist instance is generated in SAP:

image146.pngImage Addedimage148.pngImage Added

Checklist is filled and sent as attachment to the production order,

image150.pngImage Added

CHECKOUT

Perform checkout for a PP order activity on the FSM mobile app. 

image152.pngImage Added
image154.pngImage Added

Inbound checkout idoc is processed correctly.

image156.pngImage Added

Checkout is saved in dedicated FSM Cloud Connector tables:

image159.pngImage Addedimage158.pngImage Added

Checkout attachment is saved on activity and pp order level.

image160.pngImage Added
image162.pngImage Added