/
/PACG/ECM_EQUI - Equipment Master

/PACG/ECM_EQUI - Equipment Master

This is a transaction for manual sending of equipment master records from SAP ECC/S4 to FSM.

Usually, execution of this transaction is not necessary. The initial equipment transfer can be performed via the so-called full sync (see Full sync). Additionally, due to event implementation, newly created or updated equipment (IE01/IE02) will be transferred automatically.

Use this transaction to transfer singular objects to FSM or to unblock objects when other solutions fail.

image-20250207-121046.png
(S4)PACG 200 SP15 / 300 SP2
(S4)PACG 200 SP14 and older

 

Equipment ServOrd [replaced by unified ‘Force sending’]

Send equipments only if they had already been sent before. The setting prevents sending equipments not used by any service order. Currently, this functionality is handled by the ‘Force sending’ parameter.

Send Subhierarchy

Trigger sending of equipments belonging to the top-down structure of the one entered in data selection.

 

The option has the same effect as ‘Send sub hier’ in transaction /PACG/ECM_EQ1 and overwrites it (if it’s set here, send the subhierarchy, even though it’s not set in /PACG/ECM_EQ1).

Intercompany transfer

Check this field to include plants set as ‘intercompany’ when transferring equipment to SAP FSM. If no plant assignment is marked as ‘intercompany’ for a given company, this setting does not cause any changes.

(S4)PACG 200 SP08 Created on

Transfer equipment that was created on a given date or within the defined date range

(S4)PACG 200 SP08 Changed on

Transfer equipment that was changed on a given date or within the defined date range

(S4)PACG 200 SP09 Send measuring points

 

During equipment transfer, measuring points assigned to the equipment will be additionally sent. They’ll be visible on the FSM mobile application, on the equipment’s record.

Learn more about the integration scope and setup steps: Measuring points and measurements readings

(Since (S4)PACG 200 SP10, a checkbox, not a radio button. When selected, option ‘Send measuring documents’ appears.)

(S4)PACG 200 SP10 Send measuring documents / (S4)PACG 200 SP09 Send measuring points with doc

During equipment transfer, measurement points and documents created for the equipment will be additionally sent. They’ll be visible on the FSM mobile application, on the equipment’s record.

Learn more about the integration scope and setup steps: Measuring points and measurements readings

(Since (S4)PACG 200 SP10, a checkbox, not a radio button.)

(S4)PACG 200 SP16 / 300 SP3 Equipments' batch size

Send objects in batches in order to avoid system overload. Sending of subhierarchy is only possible when sending data in batches is not used.

 

Related content

/PACG/ECM_CINC01 – Included categories of Equipment
/PACG/ECM_CINC01 – Included categories of Equipment
More like this
/PACG/ECM_TRIG_TELO - Functional Location
/PACG/ECM_TRIG_TELO - Functional Location
More like this
/PACG/ECM_EQ1 - Equipment Settings
/PACG/ECM_EQ1 - Equipment Settings
Read with this
/PACG/ECM_EQS – Equipment Status
/PACG/ECM_EQS – Equipment Status
More like this
Equipment
Read with this
PACG 110 SP 1
PACG 110 SP 1
More like this

If you'd like to help us improve the documentation, please provide your feedback using the communication channels listed /wiki/spaces/PFCC/pages/1561427969. Learn about support possibilities here.